Monday, July 2, 2012

Updated/revised to-do list

Since we are halfway thru 2012 (it's flying by, right?! it's not just me?), I decided to re-visit my huge-o to-do list and cross off the stuff that has been finished!

Updated/Revised To-Do List 2012

Spring/Summer:
change 2 lights in dining room to 1 chandy (chandy already purchased)
purchase and install roller-shades in last 2 upstairs bedroom/study
clean-out all file cabinets on second floor
cleanout basement storage
re-paint my study around doors and windows
move curtain rod in my study
paint front door
re-cover seats on all dining room chairs
electrician: put dimmer switch in dining room and re-do all 3-switch plates
new QUIET dishwasher
raised beds along back of house w/ hydrangeas
garden bed edging along garage w/ bigger lilac plants
A bonfire to clean-up yard waste and deadwood
powerwash deck and re-stain and seal
repair painting table (w/Dad's help)
design basement for finishing (w/Dad's help)
backyard shed installation
we've also added - shower door purchase and installation in master bath, fire pit in the back yard and powerwashing of the house

Fall/Winter:
storage system for shed
walter filtration system for house
re-seed yard and yard extension
plant bulbs at edge of yard along woods
purchase dining room wall storage (helps to empty basement storage)
sell current wine rack
purchase and install garage overhead storage
empty and finish basement
chopping wood for fireplace
air-exchange unit for house


Possible 2013/2014:
outdoor patio around bottom of deck stairs (grill moves off the deck)
walkway from driveway around lilacs to outdoor patio
finish satellite fire-pit out in yard extension
boxwood border along far-side of yard and down driveway
plant flowering shrubs on inside of yard edge
back-up generator for entire house
new sofa for living room
seal metal bar supports and possibly re-level kitchen bar

No comments:

Post a Comment